====================================================
Project Critter — Power Budget Simulation Summary
====================================================
Simulated orbits:           30
Orbit period:              90.0 min
Eclipse fraction:           0.40
----------------------------------------------------
Solar power (sunlit):       7.35 W
Battery capacity:           200.0 Wh
SOC start → end:            80.0% → 0.0%
----------------------------------------------------
Total generation:           198.4 Wh
Total load:                 497.9 Wh
Net energy:                 -299.5 Wh
====================================================

